Integration Management
When a system is put into operation, all of the system’s components are integrated and commissioned according to predefined plans. After each partial integration stage, the subsystem is tested prior to acceptance.
Larger systems are delivered subsystem by subsystem, after which the entire system is integrated and when required linked to the customer's existing systems.
The entire system then undergoes stress tests to make sure its performance meets the requirements.
